top of page

PALMERSTON WATER PARK

Completed for the Tomazos Group in 2011, the NT Government contract of $13.6m included the concrete structures required for the 14m high x 100m long water slide, wet play areas, wading pools, café and BBQ shade areas.

 

The project whilst not technically complex, required high attention to detail for ensuring the finishes required for a pool facility were met. Consideration of jointing methods was of most importance to ensure no long term leakage of water structures.

bottom of page